New or Upgrade Service Application Form


Consultant Information
Customer/Company Information
Required Service Information
Site ID is 13 characters in length
New Total
Peak Operating load (kW) 
kW
Connected load (kW)
kW
Existing Incremental Total
Operating load (kW) 
Connected load (kW)
Service Location Information
Mobile Power

Motor Start Requirements
VFD Soft Start Across the Line 
Largest Motor by starting method (hp)
Required Site Information
Additional Documents
Customers are not required to provide a Survey Plan in order to receive a Ballpark Estimate, however providing this information in your application will help ATCO Electric prepare a more accurate Ballpark Estimate.
Please include any additional information about onsite generation or facilities at the location site that may not be included in the Survey or Plan plans and may affect the design or installation of the requested service. Please also note any known safety hazards on-site and any special permissions or requirements that ATCO Electric employees or contractors must obtain before accessing the site.
Additional Documents
Customers must provide the following two documents with their application in order to receive a Firm Proposal.
Submitting these documents is not necessary to receive a Firm Proposal, however will help ATCO Electric provide a more accurate proposal.
Please include any additional information about onsite generation or facilities at the location site that may not be included in the Survey or Plan plans and may affect the design or installation of the requested service. Please also note any known safety hazards on-site and any special permissions or requirements that ATCO Electric employees or contractors must obtain before accessing the site.