GAS AUSTRALIA

Open Trench Booking Request

For help with this form or for any enquiries please email constructionprograms@atco.com or contact 13 13 56 between 7.00AM and 6.00PM, Monday - Friday 

Private and Small Unit Developments Only
(e.g. House behind a house, Strata units etc)

This form is suitable for private and/or small developments containing under 16 units. Please contact ATCO’s Land Development Team (land.development@atco.com) regarding larger sub-divisions
(please include all relevant site plans e.g. power & water).


Submitter's Details






Unit Details

For all gas meter box location enquiries, please download the
Gas Meter Compliance Handbook




Meter Details


Please ensure the details you select in Gas Meter Size field below is accurate, and the Number of Units (Final Design) field represents all planned & potential units to be developed.

This information directly effects pipe sizing and volume of the gas service line. Accurate information at the time of the Open Trench will save you potential re-works costs should ATCO be required to up-size pipework in the future due to changes in the meter requirements.







(MJ Per Year)
Open Trench Address Details





Open Trench Maps & Documents
The trench provided must be a minimum of 750mm deep, you must ensure the full 750mm depth is maintained for the scheduled date of attendance.

All plans must be submitted in PDF format, and be top-down perspective with the meter box location, proposed trench location and the line of the trench. See Sample Site Plans

PDF File Required. Max file size 25mb

Max file size 25mb
Open Trench Booking Details

Please Note
A contact is required to be on site at the time of ATCO attending the Open Trench booking.

Weekend bookings are not available.




Weekend bookings are not available.
Please Note
You will receive an email from ATCO confirming your booking date within 3 business days of this form being submitted.


Note:
  • A minimum of two (2) hours must be available;
  • The time frame that the contractor is to attend site is not necessarily the time frame that the job may take.
Site Contact Details






Note: The Contractor must contact the site or contact phone number if they are not going to make two hour time frame.
Contractor Details



















Additional Details

Open Trench Submission
Please note the minimum installation date will be 10 business days from the date of this form submission. ATCO will email you to confirm your Trench Booking Date within 3 business days of this form being submitted.

Privacy
ATCO Gas Australia collects this information for the purpose of providing our services to you. We may provide the information to our related entities and to third parties including local government, government authorities and other service providers. For more information on how ATCO Gas Australia collects, uses, holds and discloses your personal information, see our privacy policy at www.atcogas.com.au/privacy.

Hidden